Planning an Office Fit-Out in Kampala: A Step-by-Step Guide from Empty Floor to Move-In Day

Sep 24, 2026
Home & Office Interiors
Planning an Office Fit-Out in Kampala: A Step-by-Step Guide from Empty Floor to Move-In Day

You have signed the lease on an empty office floor. The landlord hands over bare walls, a concrete ceiling and a few sockets. In a few weeks your team needs desks, meeting rooms and a reception that makes a good impression. An office fit-out has many parts, and the order you do them in makes the difference between a smooth move and a chaotic one. Here is the sequence EDEVA Uganda follows.

Office with workstations and partitions with frosted strips
An open office divided into workstations with partitions and frosted strips.

Step 1: Brief and layout

List how many people will work there, how many private offices and meeting rooms you need, storage, a kitchenette and reception. Sketch the layout on the floor plan with windows, columns, sockets and AC units marked. Put people who need quiet away from reception and the kitchen.

Step 2: Site survey and quotation

A contractor should visit, measure every wall and window, check the ceiling height and note any leaks or cracks. You should receive a clear quotation broken down by partitions, ceilings, painting, blinds and other works.

Step 3: Repairs and first-fix services

Fix roof leaks and cracked plaster first. Electricians and data technicians run cables for new sockets, lights and network points before partitions and ceilings close things up.

Step 4: Partitions

Aluminium and glass partitions go up quickly and keep the office bright; timber or drywall suit boardrooms and executive offices. Doors and locks are fitted at this stage.

Technician installing aluminium partition frames in an office
Partition frames being installed — the rooms take shape.

Step 5: Ceilings and lighting

The suspended ceiling is installed and lights, AC grilles and smoke detectors are set into it.

Finished suspended ceiling with lights
Suspended ceiling and lighting complete.

Moving into a new office? Let EDEVA handle the fit-out

EDEVA Uganda Limited has supplied and installed aluminium, partitions, blinds, curtains, ceilings and steel works across Uganda since 2007.

? Call: 0776 859084 · 0712 859084 · 0702 859084
? WhatsApp: chat with EDEVA on WhatsApp
✉️ Email: edevauganda@yahoo.com
? Office: Plot 27, Clement Hill Road, Kampala
?️ Book a site visit online at edevauganda.com

Step 6: Painting

Walls are prepared and painted once the dusty work is over. Painting last avoids scratches and dirty marks from other trades.

Step 7: Blinds and finishing

Blinds are measured on the finished windows and installed. Film strips or frosting go on glass partitions for privacy, and signs go on doors.

Boardroom with zebra blinds
Blinds finish the boardroom and control glare on screens.

Step 8: Furniture, cleaning and handover

Workstations and chairs arrive, the site is cleaned, and every door, lock, blind and light is checked before you move in.

Finished office workstations with chairs and drawers
Move-in day: workstations ready for the team.

One contractor, fewer problems

When partitions, ceilings, painting, steel works and blinds come from one company, there is one programme, one point of contact and no finger-pointing between trades. EDEVA Uganda has fitted out offices for clients including UAP Insurance, Future Options, True North, BIDCO (U) Ltd and Pioneer Cooperative Society. Read about our building, renovation and fit-out services and see completed projects.

Book a site survey for your office

EDEVA Uganda Limited has supplied and installed aluminium, partitions, blinds, curtains, ceilings and steel works across Uganda since 2007.

? Call: 0776 859084 · 0712 859084 · 0702 859084
? WhatsApp: chat with EDEVA on WhatsApp
✉️ Email: edevauganda@yahoo.com
? Office: Plot 27, Clement Hill Road, Kampala
?️ Book a site visit online at edevauganda.com

All categories
Flash Sale
Todays Deal
Messages